  • 模具英文100句,深圳市模具廠,深圳市深模塑膠模具有限公司

    2017-11-22 16:08:50

    All in English& Imperial Unit.

    全部使用英文和英制單位

    Are part dimensions to print plus shrink?

    請(qǐng)檢查內(nèi)模尺寸有否乘縮水?

    All wires protected from sharp corners?

    凡有電線通過(guò)的角位要改為R角,是否完成?

    All replaceable components must be standard components.

    所有替換的元件必須是標(biāo)準(zhǔn)件。

    Add shot counter?

    是否加啤塑總計(jì)器?

    A complicated mould with thorough design consideration to overcome the numerous design contraints.

    一個(gè)復(fù)雜的模具,設(shè)計(jì)經(jīng)過(guò)周詳考慮,成功地克服了各種設(shè)計(jì)上的限制。

    All moving components should use hardened steel : all slides should be installed with hardend or lubricated alloy wear plates and gibs, and with positive slide retainer.所有移動(dòng)的零件應(yīng)使用硬鋼料,行位必須用硬墊板和硬線條,而且必須有限位及定位鎖。

    BOM including water fittings,ejectors&custom components.

    BOM的內(nèi)容應(yīng)包含運(yùn)水接頭,頂針和自制的零件.

    BeCu for lifters if w/o water circuits。

    若沒(méi)有運(yùn)水回路,斜頂為鈹銅。

    Corresponding components mirrored at core&cavity

    對(duì)應(yīng)的部件在前、后模平面視圖中鏡像

    Check polish for line of draw finish?

    有否省光就出模?

    Crane capacity and loading clearance.

    模具須用多大吊機(jī)才可搬動(dòng)。

    Conduct moldflow &mold warp analysis.

    經(jīng)流道及變形電腦模擬分析。

    Component and/or 3D mould design drawing.

    散件圖或3D模具圖

    Cooling less important when dimensions are not important.

    若尺寸不重要,適量冷卻也可。

    Combine a traditional 4 cavity edge gate and a 4 cavities reverse gate mould which help to double the moulding capacity and reduce production cost.將一個(gè)標(biāo)準(zhǔn)四模腔大水口模具與一個(gè)四模腔倒轉(zhuǎn)大水口模具結(jié)合成為一套可于同一大小的注塑機(jī),生產(chǎn)量可增加一倍的層板模具,并且可降低成本。

    Can be seperated into two individual moulds for moulding in two different mould shops.此模具最大的特式是,可將模具分開(kāi)變成兩套,在不同地方生產(chǎn),增加生產(chǎn)的靈活性。

    Consists of all standard mould components which facilitates mould maintenance.由于全套模具均利用模具標(biāo)準(zhǔn)零件制成,在維修及換零件上比較方便。

    Die draw called out

    出模方向的標(biāo)示

    Dimension all the opening , travel & clearance

    標(biāo)出前、后模距離,滑動(dòng)部件滑動(dòng)距離和塑件脫離的位置

    DME egr. Water fittings recessed and marked?

    是否使用DME運(yùn)水接頭及編號(hào)?

    Delivery right side up , or in two halves?

    開(kāi)箱后是否容易吊出模具及是否分開(kāi)前/后模運(yùn)輸?

    Eyebolt size and balance in 2 sides

    吊模孔尺寸,平衡,4邊都要有.

    Ejection stroke & slide, lifter travel dimensioned

    出行程、行位、斜頂行程的標(biāo)注。

    Ejection study if lifter adopted

    若有斜頂,做出分析。

    Ejection extended at the most

    頂出到極限位置

    Ejector guide pins installation .

    頂針導(dǎo)柱的安裝。

    Eyebolts for inserts more than 50lbs.

    重量大于50lbs的鑲件必須要有吊模孔。

    Edge gate or sprue gate requiring secondary operation acceptable.

    邊緣型或直入型水口都可以接受。

    4 point in HRC different to lifters contacting or cavity steel.

    斜頂和與其接觸的內(nèi)模或鑲件在硬度上有4度的差別(HRC)。水口及水口頂針的4倍放大視圖,按實(shí)際尺寸標(biāo)注。

    General ,safety and handling

    常規(guī)、安全和搬運(yùn)要求。

    Guided ejection recommended for mould above 100 tons clamp capacity, ejector pins of 1.5mm or smaller, or ejector stroke longer than 50mm.建設(shè)模具用于鎖模力超過(guò)100噸的注塑機(jī),或有1.5mm以下的頂針或頂出行程超過(guò)50mm時(shí),應(yīng)裝上頂針板導(dǎo)柱。

    Guide pin cleared and vented?

    邊釘插入模板有否頂著及加疏氣空?

    Hot manifold wired to print and checked?

    熱咀電線接位有否編號(hào)?

    Horn pin clearance hole?

    斜邊與行位有否空間?

    Hydraulic actuated slide together with electrical limit switch.

    行位采用油壓推動(dòng),配合安全電制。

    Heaters fitted+0.002/-.000, leads tagged and connected to terminal.

    熱嘴裝配,電線源頭、尾有否安裝穩(wěn)固。(+0.002/.000)

    Inserts keyed and numbered to prevent incorrect assembly.

    鑲件定位和編號(hào)以防止不正確的組裝。

    Jaw angle 3 deg.more than angle pins(<25 degree).

    斜面角度要比行位斜邊角度大3度(<25度)。

    Keep enough space to run waterline at slide /lifter/major inserts.

    在行位、斜頂、主要鑲件處保留足夠位置(空間)布置水槽。

    Lifter angle less than 15 degree.

    斜頂角度小于15度。

    Lifter rods dia, less than 1".

    斜頂桿直徑不能少于1"。

    Limit switch in tact and protected.

    是否已安裝限位制?

    Moldbase and steel dimensioned

    模坯和鋼料號(hào)的標(biāo)注

    Minimum 5 deg.for shut-off.

    斜頂鑲件最小5度插穿。

    Mechanism for sequence

    動(dòng)作機(jī)構(gòu)是否正確?

    Mold safety straps installed and painted red?

    是否已安裝安全帶及噴上正確顏色在模坯上?

    Mould flow and simulation should be carried out for the best gate location, filling analysis, pressure distribution and heat distribution.

    適宜應(yīng)用模擬的模具注塑過(guò)程,注射分析、壓力分布及溫度分布以確定最佳入水位置、流道尺寸和疏氣位置等。

    Mould should be designed with maximum cooling and with appropriate amount of ejection points.

    模具在設(shè)計(jì)上要做到盡快冷卻,上、下內(nèi)模高溫點(diǎn)應(yīng)該有個(gè)別的冷卻,應(yīng)有適量頂針。

    Mould should be able to run fully automatic. Large part should be picked up by robot.

    模具能夠全自動(dòng)生產(chǎn),大的零件應(yīng)由機(jī)械手拿出。

    Mould should be tested to meet a defined Cpk quality standard.

    模具經(jīng)過(guò)測(cè)試,符合預(yù)定的Cpk質(zhì)量標(biāo)準(zhǔn)。

    Mould should have safety features to protect accidental damage, incorrect assembly and set up of mould.

    模具應(yīng)具備可以預(yù)防意外損害及錯(cuò)誤安裝等安全特性。

    Mould halves requiring accurate alignment of core and cavity, and shut off should have appropriate part line locks.

    上、下模需要精確配合或有擦位的地方, 模具一定要有直身鎖。

    Mould requiring heating should have insulator plate.

    需要加熱的模具,必須有隔熱板。

    Mould preferred to run automatic; self-degating whenever possible.

    模具最好能自動(dòng)生產(chǎn),模具盡可能自斷水口。

    No obstructions on buttom surface of mold?

    模具必須穩(wěn)定位置如有凸出物請(qǐng)加腳座,是否完成?

    Overall mold size of the moldbase & shut height

    模坯長(zhǎng)寬和模厚(模架的長(zhǎng)寬)

    Outlets accessible and marked " IN OUT and NUMBER"?

    出入水位有否打上IN 、OUT 字碼?

    Protruding items shown and protected。

    畫(huà)出突出部件并做好保護(hù)。

    Parting line at the acceptable surface.

    合模分布在合理可接受的表面。

    Put waterline as much as possible/wherever possible。

    盡可能布置多的運(yùn)水。

    Put waterline for slide /lifter/insert wherever possible.

    盡可能在行位、斜、鑲件布置運(yùn)水。

    Parting line cleared and released properly?

    分模線是否正確?

    Proper locating ring and diameter?

    定位圈尺寸及直徑是否正確?

    Proper radius and orifice on sprue bushing and keyed.

    唧嘴R及管釘是否正確?

    Part line lock recommended when there is shut off.

    當(dāng)有擦位時(shí),最好有直身鎖保護(hù)。

    Protruding items shown and protected.

    如有零件凸出,模坯請(qǐng)加保護(hù)物。

    Proper K.O. holes size and location.

    頂棍孔尺寸及位置是否正確?

    Runners to be balanced.

    流道必平衡。

    Runners cross section type and size as per standard.

    流道切面形狀和尺寸符合標(biāo)準(zhǔn)。

    Runner and parts should be ejected automatically .Multiple ejection should be avoided.頂出方法可使流道與產(chǎn)品自動(dòng)掉下,避免運(yùn)用多次頂出方法。

    Sufficient view and section

    足夠的視圖和切面圖

    Safety Strap in red

    模塊藏入模坯,要涂成紅色。

    Standing steel supported to keep stable.

    加撐腳以保前、后模能平穩(wěn)放置。

    Support pillars>50% part projection area , steel :1040。

    撐頭面積大于50%的產(chǎn)品投影面積,材料:1040.

    Safety strap clear tie bar?

    鎖模塊與哥林柱沖突嗎?

    Sucker with reverse 10 deg. Undercut。

    10度倒扣的流道拉料桿。

    Steel type & hardness of slide &heel blocks

    行位和壓條的料號(hào)和硬度。

    Sufficient stroke of lifters(1/16"+ undercut size)?

    斜頂是否有足夠的行程(1/16”+倒扣尺寸)?

    Sufficient stroke for floating plate?

    浮動(dòng)板是否有足夠的行程?

    Sufficient stroke as well as part and runner falls clear.

    是否有足夠的行程使品和流道脫落?

    Spring around return pins and press ratio<33?

    是否有回針的彈簧及其壓縮比(<33%)?

    Special instruction stamped on top and operator side?

    客戶如有特別指示請(qǐng)打在模坯頂及操作面上,有否完成?

    Screws tight and all installed?

    螺絲是否全部收緊?

    Support posts ground and screwed to clamp plate and pre-loaded.

    撐頭是否高出方鐵?

    Spring pockets correct depth , spring deflection max.40%?

    全部彈弓壓縮比是否為1/3 S?

    Standing steel well supported?

    成品與內(nèi)模之間的鋼材是否足夠?

    Single drop of cold sprue gating is designed after moldflow analysis, which ensures a balance flow of plastic and easy for moulding.

    用moldflow分析決定產(chǎn)品的入水位置,使膠料分流平均,易于注塑。

    Self-degating whenever possible .Hot runner system should be considered.……

    熱流道系統(tǒng)應(yīng)該加以考慮。

    Standard components should be used.

    盡量使用標(biāo)準(zhǔn)件。

    Semi-automatic and use of mould release acceptable.

    半自動(dòng)工手放鑲件也可

    Update title block/revision.

    更新標(biāo)題欄/版本

    Use standard components when appropriate.

    適當(dāng)?shù)臅r(shí)候使用標(biāo)準(zhǔn)件。

    View of deepest point

    最深點(diǎn)(位置)的剖切視圖

    Water circuits should run out form the ejection box.

    運(yùn)水應(yīng)從出水槽中流出。

    Waterlines clear tie bar and clamp slot?

    運(yùn)水是否同哥林柱和模槽有沖突?

    Will mould fit in quoted press?

    可否配合客戶啤機(jī)?

    Waterlines clear tie bars.

    運(yùn)水喉咀接駁位要離開(kāi)啤機(jī)呵林柱咀接駁。

    Waterline clear clamp slot.

    運(yùn)水喉咀接駁位要離開(kāi)啤機(jī)碼模坑。